Maintenance and Data Services for Long-Term Pavement Performance (LTPP) Weigh-in-Motion (WIM) Systems

Project Information

Project ID: 
FHWA-PROJ-04-0002
Project Status: 
Active
Start Date: 
Thursday, September 22, 2011
End Date: 
Monday, September 21, 2015
FHWA Program: 
Infrastructure
FHWA Subprogram: 
Long-Term Infrastructure Performance
FHWA Activity: 
Long-Term Pavement Performance
FHWA Topics: 
Roads and Bridges--Design; Roads and Bridges--Pavement and Materials; Roads and Bridges--Planning
TRT Terms: 
Calibration; Classification; Validation; Research; Pavements; Infrastructure; Weigh in Motion
FHWA Discipline: 
Design, Freight, Pavement and Materials
TRB Subject Area: 
Design, Research, Vehicles and Equipment, Freight Transportation, Highways, Pavements

Contact Information

First Name: 
Deborah
Last Name: 
Walker
Telephone: 
(202) 493-3068
Email Address: 
Team: 
Long-Term Infrastructure Performance Team
Office:
Office of Infrastructure Research and Development
Office Code: 
HRDI-30

Project Details

Project Description: 

This multiyear study will attempt to collect research-quality data by installing a Bending Plate, Load Cell, or Quartz Sensor at as many of these Specific Pavement Study (SPS) sites as economically possible. For the purpose of this study, research quality data is defined to be at least 210 days of data (in a year) of known calibration meeting the Long-Term Pavement Performance (LTPP) precision requirements for steering and tandem axles, gross vehicle weight, speed, and axle spacing.

Goal

A core objective of the Long-Term Pavement Performance (LTPP) Specific Pavement Study (SPS) is to understand and quantify the relationship between pavement performance, truck volumes, and axle loadings. The objective of this pooled fund study is to improve the quality and increase the quantity of monitored traffic data (volumes, classifications, and weights) at the SPS-1, -2, -5, -6, and -8 test sites. There are a total of 64 SPS-1, -2, -5, and -6 test sites and 20 SPS-8 sites throughout North America.

Partners and Other Sponsor/Managing/Performing Organizations: 

Deliverables

Deliverable Name: 
Fully Operational Weigh-in-Motion (WIM) System
Deliverable Type: 
Software/App
Deliverable Description: 
The contractor is responsible for providing a fully operational Weigh-in-Motion (WIM) system that collects quality WIM data according to the Long-Term Pavement Performance's (LTPP's) precision requirements. The WIM system is installed at select LTPP Specific Pavement Study (SPS) test sites