Prince William Forest Park Pavement Preservation

Project Description

The work will include pavement preservation (thin asphalt surfacing such as chip seal, slurry seal, microsurfacing, thin asphalt concrete pavement overlay or ultrathin bonded wearing course), pavement patching, crack cleaning and sealing, striping and other miscellaneous work. The proposed work will require roadway closures. The roads and parking areas currently considered for the project are Park Entrance Road, Scenic Drive, Turkey Run Road, Oak Ridge Road (aka W. Gate Fire Road), Telegraph Road, Entrance Kiosk Parking, Telegraph Road Picnic Area Parking, Scenic Drive Parking Areas A through I, and Oak Ridge Campground Parking. The roads can be accessed from Joplin Road (State Route 619) from the south.

Anticipated Timeline

Advertisement and Award: Fall 2020-Spring 2021
Construction: Spring 2021 – Fall 2021