You are here

Haystack Reservoir Paving

Project Description

The project involves placing a hot asphalt concrete surface on the gravel access road and campground loop roads of the South Shore Recreation Area.

Anticipated Timeline

  • Advertise:  Fall 2020
  • Construction: Spring 2021

Project Photos