Logandale Trails Access Road

Project Description

The purpose of the project is to improve roadway safety and reduce maintenance costs. The existing roadway is narrow and constructed of native material, which produces significant dust during wind storms and heavy visitor use. Drainage features along the roadway is minimal and requires frequent maintenance.

The project improvements include grading, widening, placing aggregate base, drainage, and paving 3.25 miles of road. The road will be paved at 26 feet wide with 11-foot lanes and 2-foot shoulders. Signing and striping will be added per MUTCD requirements. At the Logandale Trails parking lot, 700 feet of roadway will be converted to one‐way loop with two turnaround locations at either end of the one‐way roads.

Anticipated Timeline

Advertise: Winter 2021
Construction: Spring/Summer 2022

Project Photos