The project will rehabilitate several roads accessing Kirwin National Wildlife Refuge. The roads included are South Side Drive (Route 14 aka South Kirwin Lake Road) starting at the south end at the E 700 Road intersection and ending on the north end at the E 1100 Road intersection, Silver Bridge Road, and the Klin Road. Associated gravel parking areas will also be resurfaced. The work will include gravel road resurfacing, drainage improvements including replacing pipe culverts with larger reinforced concrete pipe culverts, riprap, and other miscellaneous work.

Anticipated Timeline

Advertisement and Award:  Spring 2020 - Summer 2020
Construction Dates:  Summer 2020 - Fall 2021 