Project Description
This project will rehabilitate the asphalt surface 3R on 4.7 miles of the Mesa Top Road (MEVE 101), including associated parking areas. Scope of work includes road base repairs in all lanes, replacement of failing drainage systems, resurfacing pull outs and shoulder repair work. Multiple culverts will need to be replaced.
Update 1/24/22
Project will resume construction in the Spring 2022 and construction will end in the Fall 2022.
Anticipated Timeline
Advertise Date: Fall 2020
Construction Date: Summer 2021