You are here

Trinity Alps Wilderness Study

Public Involvement

We want to hear from you. Which of these routes do you use for recreational access to the Trinity Alps Wilderness Area? What routes do you think need the most attention? Please click here to complete an online survey. In addition, public meetings will be held in May 2019 at the following times and locations.

Public Meetings

Public Meeting Schedule
DateLocationTime
5/6/2019Trinity Center 100F Hall
20 Scott Boulevard
Trinity Center, CA 96091
6:00 pm - 7:30 pm
5/7/2019Grange Hall
131 Dutch Creek Road
Junction City, CA 96048
6:00 pm - 7:30 pm
5/8/2019Weaverville Library
351 Main Street
Weaverville, CA 96093
5:00 pm - 6:30 pm
5/9/2019Burnt Ranch Elementary School
251 Burnt Ranch School Road
Burnt Ranch, CA 95527
5:30 pm - 7:00 pm

Project Description

The Federal Highway Administration Central Federal Lands Division (FHWA CFLHD), in partnership with Trinity County and the U.S. Forest Service (USFS), is conducting a study to identify and prioritize improvement projects on several roads within Trinity County that provide recreational access into the Trinity Alps Wilderness.

Ten road corridors of varying lengths and conditions are being considered as part of the study. Most of the road corridors are managed and maintained by the county up until a certain mileage point, at which point they are managed and maintained by the USFS. Anticipated improvements will focus on improved safety and could include the following; roadway reconditioning, drainage improvements, improved signage, trailhead parking area improvements, road surface improvements, slope stabilization in spot locations, and rockfall mitigation.

This planning effort will allow Trinity County to define recommended improvements along each route, estimate costs, gather public input and preferences, and consider opportunities to coordinate or pair projects. In addition, planning efforts will identify possible federal, state, and local funding sources to implement improvements.

Map of Routes


Map showing corridors considered in the study

Anticipated Timeline

Advertise Date: NA – study only
Award Letter Date: NA – study only
Construction Date: NA – study only
Estimated Completion Date: Study completion date of Fall 2019