South Lake Road

Project Description

This project will pulverize and repave 6.9 miles of South Lake Road from the intersection with State Route 168 to South Lake. It includes minor widening (along the first 2.1 miles) to accommodate a widened, multi-use shoulder in addition to grading, pulverization of existing pavement, replacement of minor drainage structures, spot repairs to major drainage structures, slope stabilization, rock scaling, placement of crushed aggregate base and asphalt pavement, signing, striping, and other safety-related features.

Anticipated Timeline

Advertise: Fall 2019
Construction: Spring – Fall 2020