Ruth-Zenia Road and Van Duzen Road

Project Description

This project widens and rehabilitates 3.6 miles of asphalt pavement with drainage improvements along three separate segments on Van Duzen Road and widens and re-aligns approximately 1.6 miles of roadway along two separate segments on Ruth-Zenia Road. Two minor retaining walls along Van Duzen Road are being constructed.

Anticipated Timeline

Advertise: Spring 2021
Construction: Spring - Fall 2021

Project Photos