The Smittle Creek Trail Bridges project is located along the western shore of Lake Berryessa, approximately 40 miles west of Sacramento, CA. The project includes the replacement of five pedestrian timber bridges along a narrow trail, that were destroyed in a 2020 fire. The bridge lengths vary between 16 and 26 feet. The project scope also includes replacement of access control gate, bollards, and signs.
Anticipated Timeline
Advertise: Summer 2022
Construction: Fall 2023