You are here

Development of Lightweight Floor Replacement Systems

Project Information

Project ID: 
FHWA-PROJ-11-0063
Project Status: 
Active
Start Date: 
Thursday, September 1, 2011
End Date: 
Tuesday, September 30, 2014
FHWA Program: 
Infrastructure
FHWA Subprogram: 
Structures
FHWA Topics: 
Roads and Bridges--Structures
TRT Terms: 
Covered Bridges; Bridge Decks; Wooden Bridges; Research; Infrastructure; Bridges
FHWA Discipline: 
Design, Structures
TRB Subject Area: 
Bridges and other structures, Research

Contact Information

First Name: 
Sheila
Last Name: 
Duwadi
Telephone: 
(202) 493-3106
Email Address: 
Team: 
Infrastructure Analysis and Construction Team
Office:
Office of Infrastructure Research and Development
Office Code: 
HRDI-20

Project Details

Project Description: 

The floor systems of covered bridges are typically replaced due to deterioration, structural damage, or excessive wear after approximately 30 to 40 years of service. In many cases, the floor system controls a bridge’s capacity, and replacement operations present a unique opportunity to upgrade the entire structural system. Because covered bridges are so unique, there are a wide variety of general replacement systems currently in use. However, these systems have seen very little change after many years of implementation, thus there exists a need to develop new replacement flooring systems that improve both the deck system itself as well as improve the overall structural performance. It is envisioned that this is most effectively completed through the use of lightweight systems. Another aspect of floor systems is the replacement of floor beams. In any truss bridge, floor beams receive a great deal of abuse and wear. This is also true of covered bridges. Their floor beams are often found to be wanting and are replaced; however, the beams may still be adequate in some of these cases. This area needs to be restudied to better define the problem and replacement criteria developed.

Partners and Other Sponsor/Managing/Performing Organizations: 
Organization Role: 
Partner: Technical

Deliverables

Deliverable Name: 
Lightweight Flooring Systems for Historic Covered Bridges (9/2014)
Deliverable Type: 
Research report or guidelines
Deliverable Description: 
Publication evaluating the types of floor systems commonly used on covered bridges and the development and testing of a lightweight replacement system.