You are here

Covered Bridge Preservation Research, Development, and Technology: Interagency Agreement II with the Forest Service, Forest Products Laboratory

Project Information

Project ID: 
FHWA-PROJ-12-0055
Project Status: 
Active
Start Date: 
Monday, July 2, 2012
End Date: 
Monday, September 30, 2019
FHWA Program: 
Infrastructure
FHWA Subprogram: 
Structures
FHWA Topics: 
Roads and Bridges--Structures
TRT Terms: 
Covered Bridges; Historic Bridges; Wooden Bridges; Infrastructure; Research; Bridges; Rehabilitation (Maintenance)
FHWA Discipline: 
Structures
TRB Subject Area: 
Bridges and other structures, Research

Contact Information

First Name: 
Sheila
Last Name: 
Duwadi
Telephone: 
(202) 493-3106
Email Address: 
Team: 
Infrastructure Analysis and Construction Team
Office:
Office of Infrastructure Research and Development
Office Code: 
HRDI-20

Project Details

Project Description: 

Under this interagency agreement the following activities/studies have been initiated to develop technologies and methodologies to preserve, rehabilitate, and restore historic covered bridges and timber bridges, and for education and technology transfer: I.  Inspection, Preservation, and Maintenance of Covered Bridges Advanced Field Evaluation Tools for Condition Assessment of Wood Members in Covered BridgesImproving Understanding of Moisture Effects on Outdoor Wood Adhesive BondlinesEarly Detection and Eradication of Termite Infestations Destructive to Covered Bridge Structures by Acoustic EmissionII. Strengthening and Rehabilitation - No studies this period.III. System Behavior Covered Bridge Rating Through Load Testing - Phase IIImproved Analytical Techniques for Historic Covered Bridges - Phase IIGRS-Timber BridgeIV. Education and Technology TransferWebinarsMaintenance of the World Guide to Covered Bridges

Deliverables

Deliverable Name: 
Reports and Guidelines
Deliverable Type: 
Research report or guidelines
Deliverable Description: 
Multiple reports and guidance documents will be developed depending on studies undertaken.